Zigzag pattern: the number of loops is a multiple of 12 + 1 +2 chrome. Knit according to the pattern on which only persons are shown. R., in out. R. all loops and crochets knit out. Start with 1 chrome., Repeat rapport, end with a loop after rapport and 1 chrome.
Repeat from 1st to 4th p., Observing the color change. When adding and decreasing, make sure that the number of yarn crochets corresponds to the number of loops knitted together.
The sequence of alternating patterns: 52 p. persons. surface in sequence A and 56 p. persons. smooth in sequence B.
Back: dial with turquoise thread 75 (87) p. And knit for the strap 2 cm = 3 p. garter stitch starting from 1 out. R. and then tie 2 p. persons. stitch. After that, knit a zigzag pattern. After 15 cm = 28 p. close from the strap for fitting from both sides 1 p. and in each 10 m p. 4 x 1 p. = 65 (77) p. Simultaneously through 25 cm = 48 p.
from the bar start to knit in the sequence of alternating patterns. After 14.5 cm = 30 p. from changing patterns add on both sides 1 p. and in the next 20 r. 1 x 1 p. = 69 (81) p. After 31.5 cm = 66 p. (27.5 cm = 58 p.) From the change of patterns, close for armholes on both sides 2 p. And in each 2 m p. 1 x 2 and 4 x 1 p. = 53 (65) p. After 49.5 cm = 104 p. from changing patterns, close the middle 25 (29) p. to cut the neckline and finish both sides separately.
For rounding, close from the inner edge in the next 2nd p. 1 x 4 p.
At the same time, after 50.5 cm = 106 p. from changing patterns, close for shoulder bevels on both sides of 5 (7) p. After 51.5 cm = 108 p. from changing patterns, close the remaining 5 (7) p. of shoulder on each side.
Before: knit in the same way, but with a V-neck. For this, after 34.5 cm = 72 p. from changing patterns, close the middle section and finish both sides separately. For bevel, close from the inner edge in every 2 r. 4 (5) x 2 and alternately in each of the 2nd and 4th p. 8 x 1 p.
Sleeves: turquoise thread dial 44 (56) p. And tie the bar, as on the back. Then knit faces. smooth surface in the sequence of alternation of bands B, starting with 2 purple p. After 1 cm = 2 p. close from the strap for okat sleeves on both sides of 2 (4) p., in each 4th p. 5 x and in each 2 r. 5 x 1 p. After 16 cm = 34 p. close the remaining 20 (28) p.
Assembly: perform shoulder seams. On the neckline, dial 96 p. With turquoise thread on circular knitting needles, knit 1 circle. R. out. and close all loops of faces. Stitch sleeves, sew side seams and sleeve seams.